Installation inside a fermenter

 
 
PDF Icon   » Download Installation Instruction
 
 

 
 

» Enlarged view
The first step is to determine the height of the suspension rails using a laser measuring device and to drill the holes required at a distance of c. 1m from each other.
 

» Enlarged view
Next the suspension rails for the piping are installed. The screws used here are also made of stainless steel.
 

» Enlarged view
The endless, spirally corrugated BIOFLEX® pipe is unrolled metre by metre...
 

» Enlarged view
...aligned and secured provisionally...
 

» Enlarged view
...and fixed to the suspension rails using pipe brackets.
 

» Enlarged view
The pipes after installation is completed.
 